Site under construction
These webpages are currently being updated. We apologise for any inconvenience.
If you cannot find what you are looking for, please contact planningpolicy@cheshirewestandchester.gov.uk
The self-build and custom housebuilding register records the level of demand for self-build and custom housebuilding in the Borough. Each registration (completed form) is assessed against nationally set eligibility criteria, and locally set local connection criteria.
Self-build demand base periods are 31 October – 30 October. The demand from individuals and groups, for each base period is set out in the table below. Between January 2016 and October 2019, the register was based on the national eligibility criteria alone, and demand was reported as a single Part 1 register. In October 2019 local connection criteria were added to the registration process and demand is now shown in two parts: Part 1 (meeting national eligibility and local connection criteria) and Part 2 (meeting national eligibility criteria only).
| Number of new registrations by individuals and groups in each base period | |||||||||
| Part 1 | Part 2 | Total | |||||||
| Base period: | Individuals | Groups | Total | Individuals | Groups | Total | Individuals | Groups | Total |
| 1: 1 Jan 2016 – 30 Oct 2016 | - | - | - | - | - | - | 118 | 2 | 120 |
| 2: 31 Oct 2016 – 30 Oct 2017 | - | - | - | - | - | - | 110 | 3 | 113 |
| 3: 31 Oct 2017 – 30 Oct 2018 | - | - | - | - | - | - | 92 | 2 | 94 |
| 4: 31 Oct 2018 – 30 Oct 2019 | - | - | - | - | - | - | 65 | 5 | 70 |
| 5: 31 Oct 2019 - 30 Oct 2020 | 41 | 1 | 42 | 16* | 2* | 18 | 57 | 3 | 60 |
| 6: 31 Oct 2020 - 30 Oct 2021 | 48 | 0 | 48 | 15 | 0 | 15 | 63 | 0 | 63 |
| 7: 31 Oct 2021 - 30 Oct 2022 | 41** | 1** | 42 | 21** | 1** | 22 | 62 | 2 | 64 |
| 8: 31 Oct 2022 - 30 Oct 2023 | 15 | 0 | 15 | 19 | 0 | 19 | 34 | 0 | 34 |
| 9: 31 Oct 2023 – 30 Oct 2024 | 26 | 0 | 26 | 12 | 0 | 12 | 36 | 0 | 36 |
| 10: 31 Oct 2024 - 30 Oct 2025 | 9 | 0 | 9 | 2 | 0 | 2 | 11 | 0 | 11 |
*Two applications in the 2019-2020 base period indicated that they were registering both as individual and on behalf of a group, so have been included in both the individual and group Part 2 figures.
**Two applications in the 2021-2022 base period indicated that they were registering both as individual and on behalf of a group, so have been included in both the individual and group figures (one each for Part 1 and Part 2).
For further information on local connection criteria and definitions related to self-build and custom housebuilding, please see the supporting FAQs.